Container Freight Station (CFS) and Central Container Examination Facility (CCEF)
Project Objective In line with activities aimed at repositioning the Port of Bridgetown as a logistics hub, Barbados Port Inc (BPI) is advancing the development of a Container Freight Station (CFS) and Central Container Examination Facility (CCEF). This project aims to: Improve operational efficiency in the handling break bulk cargo Streamline delivery of breakbulk cargo...
Read more →
Waste to Energy
What is Waste to Energy? Waste to Energy (WTE) is an innovative process transforming heat energy from destroying waste materials into usable electrical energy. At our WTE facility, waste is collected, stored temporarily, and then incinerated in a high-temperature furnace. The heat generated from this process is used to boil water, producing steam. This steam...
Read more →
Berth 6 Project
Project Objective To expand berthing capacity at the Port of Bridgetown. Project Description The Berth 6 expansion (B6E) project is a 314m long x 25m wide (ca. 7850m2) elevated piled supported deck structure constructed of composite precast/in-situ concrete elements such as piles (505mm ranging from 26.6m to 42m in length), fender beams, channel beams, crane...
Read more →



